Job #8024, Rewiring, Elevator, Remodelling Librarian's Office - 1947-1950 - Librarian's Office

 File — Box: 3, Folder: 34
Identifier: NL Archives 13/00/03
Scope and Contents From the Series: Although the Newberry Library was officially opened in November of 1893, portions of the interior structure were not finished until the 1940's when further space was required. In addition, as needs and technology changed, renovations of existing rooms and systems took place. Major projects have included the 1895-1897 renovation of the heating and ventilating systems, the 1899 and 1923 Trustee Room remodellings, the 1925-1926 Ayer Vault construction, the 1944-1946 fifth floor completion and...

Job #8024, Rewiring, Elevator, Remodelling Librarian's Office - 1947-1950 - Contracts

 File — Box: 3, Folder: 35
Identifier: NL Archives 13/00/03
Scope and Contents From the Series: Although the Newberry Library was officially opened in November of 1893, portions of the interior structure were not finished until the 1940's when further space was required. In addition, as needs and technology changed, renovations of existing rooms and systems took place. Major projects have included the 1895-1897 renovation of the heating and ventilating systems, the 1899 and 1923 Trustee Room remodellings, the 1925-1926 Ayer Vault construction, the 1944-1946 fifth floor completion and...

Job #8024, Rewiring, Elevator, Remodelling Librarian's Office - 1947-1950 - Correspondence

 File — Box: 3, Folder: 36
Identifier: NL Archives 13/00/03
Scope and Contents From the Series: Although the Newberry Library was officially opened in November of 1893, portions of the interior structure were not finished until the 1940's when further space was required. In addition, as needs and technology changed, renovations of existing rooms and systems took place. Major projects have included the 1895-1897 renovation of the heating and ventilating systems, the 1899 and 1923 Trustee Room remodellings, the 1925-1926 Ayer Vault construction, the 1944-1946 fifth floor completion and...

Job #8024, Rewiring, Elevator, Remodelling Librarian's Office - 1947-1950 - Specifications

 File — Box: 3, Folder: 37
Identifier: NL Archives 13/00/03
Scope and Contents From the Series: Although the Newberry Library was officially opened in November of 1893, portions of the interior structure were not finished until the 1940's when further space was required. In addition, as needs and technology changed, renovations of existing rooms and systems took place. Major projects have included the 1895-1897 renovation of the heating and ventilating systems, the 1899 and 1923 Trustee Room remodellings, the 1925-1926 Ayer Vault construction, the 1944-1946 fifth floor completion and...

Job #8024, Rewiring, Elevator, Remodelling Librarian's Office - 1947-1950 - Statements - Contractor

 File — Box: 3, Folder: 38
Identifier: NL Archives 13/00/03
Scope and Contents From the Series: Although the Newberry Library was officially opened in November of 1893, portions of the interior structure were not finished until the 1940's when further space was required. In addition, as needs and technology changed, renovations of existing rooms and systems took place. Major projects have included the 1895-1897 renovation of the heating and ventilating systems, the 1899 and 1923 Trustee Room remodellings, the 1925-1926 Ayer Vault construction, the 1944-1946 fifth floor completion and...

Job #8024, Rewiring, Elevator, Remodelling Librarian's Office - 1947-1950 - Statements - Summaries

 File — Box: 3, Folder: 39
Identifier: NL Archives 13/00/03
Scope and Contents From the Series: Although the Newberry Library was officially opened in November of 1893, portions of the interior structure were not finished until the 1940's when further space was required. In addition, as needs and technology changed, renovations of existing rooms and systems took place. Major projects have included the 1895-1897 renovation of the heating and ventilating systems, the 1899 and 1923 Trustee Room remodellings, the 1925-1926 Ayer Vault construction, the 1944-1946 fifth floor completion and...

Proposals for Addition to the Building, 1950

 File — Box: 3, Folder: 40
Identifier: NL Archives 13/00/03
Scope and Contents From the Series: Although the Newberry Library was officially opened in November of 1893, portions of the interior structure were not finished until the 1940's when further space was required. In addition, as needs and technology changed, renovations of existing rooms and systems took place. Major projects have included the 1895-1897 renovation of the heating and ventilating systems, the 1899 and 1923 Trustee Room remodellings, the 1925-1926 Ayer Vault construction, the 1944-1946 fifth floor completion and...
Dates: 1950

Job #8792, Visitors' Lounge, Wing Rooms - Fifth Floor - 1953-1954 - Contract

 File — Box: 3, Folder: 41
Identifier: NL Archives 13/00/03
Scope and Contents From the Series: Although the Newberry Library was officially opened in November of 1893, portions of the interior structure were not finished until the 1940's when further space was required. In addition, as needs and technology changed, renovations of existing rooms and systems took place. Major projects have included the 1895-1897 renovation of the heating and ventilating systems, the 1899 and 1923 Trustee Room remodellings, the 1925-1926 Ayer Vault construction, the 1944-1946 fifth floor completion and...

Job #8792, Visitors' Lounge, Wing Rooms - Fifth Floor - 1953-1954 - Correspondence

 File — Box: 3, Folder: 42
Identifier: NL Archives 13/00/03
Scope and Contents From the Series: Although the Newberry Library was officially opened in November of 1893, portions of the interior structure were not finished until the 1940's when further space was required. In addition, as needs and technology changed, renovations of existing rooms and systems took place. Major projects have included the 1895-1897 renovation of the heating and ventilating systems, the 1899 and 1923 Trustee Room remodellings, the 1925-1926 Ayer Vault construction, the 1944-1946 fifth floor completion and...

Job #8792, Visitors' Lounge, Wing Rooms - Fifth Floor - 1953-1954 - Statements, Contractor

 File — Box: 3, Folder: 43
Identifier: NL Archives 13/00/03
Scope and Contents From the Series: Although the Newberry Library was officially opened in November of 1893, portions of the interior structure were not finished until the 1940's when further space was required. In addition, as needs and technology changed, renovations of existing rooms and systems took place. Major projects have included the 1895-1897 renovation of the heating and ventilating systems, the 1899 and 1923 Trustee Room remodellings, the 1925-1926 Ayer Vault construction, the 1944-1946 fifth floor completion and...